Mamathesh Gowda

Mamathesh Gowda

Aerial feed planning
for production teams.

Discuss an aerial camera feed for your production or event workflow. Bengaluru-based, available across India.

DGCA-certified drone pilot

← Back to all drone shoots
Illustrative production setup

Fit the aerial view
into your workflow.

Start with your technical team’s receiving requirements and the intended use of the feed.

Useful for these briefs

  • Production monitoring

    Discuss aerial viewing for the director or production team.

  • Event technical workflows

    Review how an agreed aerial feed may fit your event setup.

  • Technical coordination

    Confirm compatibility, handoff responsibilities and a test plan.

Illustrative outdoor production control desk with aerial viewing monitors
Illustrative shot example

Production setups to discuss.

The receiving arrangement and site conditions determine the workable scope.

Illustrative director checking a field monitor beside a film set
Illustrative shot example

Director-monitor context

Discuss how the aerial view may be used by the director or production team.

Illustrative outdoor event control desk and monitors
Illustrative shot example

Event-control context

Review the receiving arrangement within your event technical setup.

Illustrative technicians checking a monitor at the venue perimeter
Illustrative shot example

Setup & compatibility check

Confirm site conditions, communication and handoff responsibilities.

Illustrative concepts. Feed availability and technical details are confirmed for each brief.

A technical brief. A confirmed plan.

1

Share the feed requirement

Purpose, receiving setup, location, date, schedule and budget.

2

Review compatibility

Agree feasibility, connections, responsibilities and a test arrangement.

3

Confirm the scope

Agree viewing windows, capture needs and the work order.

Agree the technical details first.

Receiving setup & responsibilities

Your technical team shares the intended receiving arrangement and confirms the equipment and crew responsibilities.

Site access & safe flight

Your team arranges access and applicable permissions. Required approvals and safe flight conditions are checked before operating.

Feed format, latency, range and continuity are confirmed through technical review. Switcher operation, screen supply and streaming are separate requirements to confirm.

Pricing that fits the brief.

₹9,999 / hour

+ applicable GST · Custom project quotes available.

Have a budget allocated?

Share the location, date, requirements and budget. Let’s discuss suitable aerial coverage.

Have a production-feed brief?
Let’s discuss the aerial workflow.

© 2018–2026 Mamathesh Gowda · Bengaluru · Across IndiaPrivacy PolicySitemapAI/LLMsManaged by Sivte
WhatsApp